39 Additional new terminal gates connected by Champion ONE’s solution
THE CHALLENGE
The international airport that serves a large Midwestern metropolitan area is planning a largescale
new terminal build. As part of this project, they will need to connect their main airport and
downtown airport over 4 separate fiber circuits along 2 redundant paths. While the southern route
could be supported with 40km 100G optics, the 87km northern route exceeded the rated distances
for these standard optics.
THE SOLUTION
Champion ONE supplied the airport with the 8 Channel 100G Active DWDM Open Line System, paired with 100G PAM4 DWDM QSFP28 transceivers. This system’s combination of mux/demux, amplification,
and dispersion compensation functionality in a compact 1RU enclosure has enough power to reach distances of up to 100km.
RESULTS
Implementation of the system is scheduled for Q1 of 2020. Once deployed, the airport will have 800G total throughput capacity on one pair of fibers. Since they only plan on lighting 3 channels initially, they will have 62.5% excess capacity, positioning them well for future growth. Once completed (scheduled for 2023), the new terminal will boast 39 new gates, as well as over 1,000,000 square feet of floor space and a
6300-space parking structure.